rooftop solar photovoltaics, net metering, quota system, grid integration, hosting capacity, IndonesiaAbstract
Indonesia replaced net metering for rooftop solar photovoltaics (PV) in January 2024 with a regime in which exported energy earns nothing and new connections are rationed by a five-year quota proposed by the utility. This policy analysis reads the ministerial regulations of 2018, 2021 and 2024 at article level and sets them against official capacity figures, the 2025–2034 electricity supply plan, the 2025 National Energy Policy and published engineering and techno-economic studies. Rooftop capacity rose from 140 MW (December 2023) to 538 MWp (July 2025) and 895 MW (April 2026), about 60% of all installed solar, while the 2024–2028 quota totals 5,746 MW. Installations since 2023 equal at most 40% of the 2024–2025 quota; filling the quota by 2028 would need about 156 MW per month, roughly four times the recent pace. Without export credit, a system that self-consumes half its output takes twice as long to pay back. The article argues that the quota can deliver the reduced 2 GW goal through industrial self-consumption, but not the household segment or the larger solar ambitions, because it is a ceiling without a floor set by an interested party. Feeder-level hosting-capacity quotas, inverter requirements and storage-linked export credit are proposed.References
[1] Minister of Energy and Mineral Resources of the Republic of Indonesia, “Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 49 Tahun 2018 tentang Penggunaan Sistem Pembangkit Listrik Tenaga Surya Atap oleh Konsumen PT Perusahaan Listrik Negara (Persero),” Berita Negara Republik Indonesia Tahun 2018 Nomor 1525, Jakarta, Indonesia, Nov. 16, 2018. [Online]. Available: https://peraturan.bpk.go.id/Details/142300/permen-esdm-no-49-tahun-2018 (accessed Oct. 8, 2026).
[2] Minister of Energy and Mineral Resources of the Republic of Indonesia, “Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 16 Tahun 2019 tentang Perubahan Kedua atas Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 49 Tahun 2018 tentang Penggunaan Sistem Pembangkit Listrik Tenaga Surya Atap oleh Konsumen PT Perusahaan Listrik Negara (Persero),” Berita Negara Republik Indonesia Tahun 2019 Nomor 1179, Jakarta, Indonesia, Oct. 14, 2019. [Online]. Available: https://peraturan.bpk.go.id/Details/142322/permen-esdm-no-16-tahun-2019 (accessed Oct. 8, 2026).
[3] Minister of Energy and Mineral Resources of the Republic of Indonesia, “Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 26 Tahun 2021 tentang Pembangkit Listrik Tenaga Surya Atap yang Terhubung pada Jaringan Tenaga Listrik Pemegang Izin Usaha Penyediaan Tenaga Listrik untuk Kepentingan Umum,” Berita Negara Republik Indonesia Tahun 2021 Nomor 948, Jakarta, Indonesia, Aug. 20, 2021. [Online]. Available: https://peraturan.bpk.go.id/Details/257416/permen-esdm-no-26-tahun-2021 (accessed Oct. 8, 2026).
[4] Minister of Energy and Mineral Resources of the Republic of Indonesia, “Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 2 Tahun 2024 tentang Pembangkit Listrik Tenaga Surya Atap yang Terhubung pada Jaringan Tenaga Listrik Pemegang Izin Usaha Penyediaan Tenaga Listrik untuk Kepentingan Umum,” Berita Negara Republik Indonesia Tahun 2024 Nomor 70, Jakarta, Indonesia, Jan. 31, 2024. [Online]. Available: https://peraturan.bpk.go.id/Details/288519/permen-esdm-no-2-tahun-2024 (accessed Oct. 8, 2026).
[5] P. I. Savitri, “Kementerian ESDM catat capaian pengembangan PLTS Atap sebesar 140 MW,” ANTARA News, Mar. 5, 2024. [Online]. Available: https://www.antaranews.com/berita/3995433/kementerian-esdm-catat-capaian-pengembangan-plts-atap-sebesar-140-mw (accessed Oct. 8, 2026).
[6] P. I. Savitri, “PLN atasi ketidakstabilan PLTS Atap dengan sistem kuota,” ANTARA News, Mar. 5, 2024. [Online]. Available: https://www.antaranews.com/berita/3995919/pln-atasi-ketidakstabilan-plts-atap-dengan-sistem-kuota (accessed Oct. 8, 2026).
[7] P. Jowett, “Indonesian government abolishes net metering,” pv magazine, Feb. 28, 2024. [Online]. Available: https://www.pv-magazine.com/2024/02/28/indonesian-government-abolishes-net-metering/ (accessed Oct. 8, 2026).
[8] P. I. Savitri, “Pemerintah masih lakukan revisi RUPTL PLN untuk PLTS 100 GWp,” ANTARA News, Sep. 22, 2026. [Online]. Available: https://www.antaranews.com/berita/5753284/pemerintah-masih-lakukan-revisi-ruptl-pln-untuk-plts-100-gwp (accessed Oct. 8, 2026).
[9] Government of the Republic of Indonesia, “Peraturan Pemerintah Nomor 40 Tahun 2025 tentang Kebijakan Energi Nasional,” Lembaran Negara Republik Indonesia Tahun 2025 Nomor 149, Jakarta, Indonesia, Sep. 15, 2025. [Online]. Available: https://peraturan.bpk.go.id/Details/328789/pp-no-40-tahun-2025 (accessed Oct. 8, 2026).
[10] P. Jowett, “Indonesia’s solar capacity reaches 1.49 GW,” pv magazine, Feb. 4, 2026. [Online]. Available: https://www.pv-magazine.com/2026/02/04/indonesias-solar-capacity-reaches-1-49-gw/ (accessed Oct. 8, 2026).
[11] U. Simanjuntak, “Chasing 100 GW of solar PV in three years,” Institute for Essential Services Reform, Jakarta, Indonesia, Oct. 7, 2026. [Online]. Available: https://iesr.or.id/en/chasing-100-gw-of-solar-pv-in-three-years/ (accessed Oct. 8, 2026).
[12] A. N. Zhafira, “Kementerian ESDM bahas deregulasi PLTS untuk pacu transisi EBT,” ANTARA News, Apr. 21, 2026. [Online]. Available: https://www.antaranews.com/berita/5535619/kementerian-esdm-bahas-deregulasi-plts-untuk-pacu-transisi-ebt (accessed Oct. 8, 2026).
[13] F. A. Pramadya and K. N. Kim, “Promoting residential rooftop solar photovoltaics in Indonesia: Net-metering or installation incentives?,” Renew. Energy, vol. 222, Art. no. 119901, 2024, doi: 10.1016/j.renene.2023.119901.
[14] E. Tarigan, “Financial analysis of solar rooftop PV system: Case study in Indonesia,” Int. J. Energy Econ. Policy, vol. 13, no. 3, pp. 15–19, 2023, doi: 10.32479/ijeep.14214.
[15] A. Fahmi and A. D. Rarasati, “Rooftop photovoltaic in public buildings: Technical and financial evidence from multi-year operational data in Indonesia,” Next Energy, vol. 13, Art. no. 100770, 2026, doi: 10.1016/j.nxener.2026.100770.
[16] A. P. Galevien, M. K. Ridwan, and A. N. I. Wardana, “Assessing the viability of rooftop solar PV in energy-intensive industries: A techno-economic and safety framework for the Indonesian FMCG sector,” Energies, vol. 18, no. 21, Art. no. 5859, 2025, doi: 10.3390/en18215859.
[17] J. Gunawan, T. Alifia, and K. Fraser, “Achieving renewable energy targets: The impact of residential solar PV prosumers in Indonesia,” Int. J. Sustain. Energy Plan. Manag., vol. 32, 2021, doi: 10.5278/ijsepm.6314.
[18] A. P. Redaputri, C. B. Santoso, and M. Y. S. Barusman, “Photovoltaics rooftop regulations and their connection to pro-environment consumer behavior in Indonesia,” Sustinere: J. Environ. Sustain., vol. 8, no. 2, 2024, doi: 10.22515/sustinere.jes.v8i2.399.
[19] F. N. Haryadi, A. A. Simaremare, D. F. Hakam, I. A. Aditya, and I. Haryani, “Strategies for increasing the use of rooftop PV in Indonesia,” J. Dev. Econ., vol. 7, no. 1, pp. 70–83, 2022, doi: 10.20473/jde.v7i1.35679.
[20] M. H. Saifurrohman, M. H. Hasyid, L. M. Putranto, S. P. Hadi, W. Susatyo, and S. Isnandar, “Battery energy storage systems reinforcement control strategy to enhanced the maximum integration of PV to generation systems,” Results Eng., vol. 18, Art. no. 101184, 2023, doi: 10.1016/j.rineng.2023.101184.
[21] M. Guenther, “Challenges of a 100% renewable energy supply in the Java-Bali grid,” Int. J. Technol., vol. 9, no. 2, pp. 257–266, 2018, doi: 10.14716/ijtech.v9i2.1027.
[22] T. Wrahatnolo and Y. S. Nugroho, “Accelerating Indonesia’s solar PV transition toward net-zero: Integrating smart grid innovation, energy storage, and adaptive regulatory frameworks,” E3S Web Conf., vol. 736, Art. no. 04006, 2026, doi: 10.1051/e3sconf/202673604006.
[23] S. Isnandar et al., “Modelling rooftop solar capacity in Indonesia: Monte Carlo and ARIMA forecasting of VRE growth under policy constraint,” Int. J. Electr. Eng. Inform., vol. 17, no. 1, pp. 1–17, 2025, doi: 10.15676/ijeei.2025.17.1.1.
[24] B. Ferdiansyah, “KESDM sebut tak ada ketentuan ekspor-impor di aturan baru PLTS atap,” ANTARA News, Feb. 23, 2024. [Online]. Available: https://www.antaranews.com/berita/3979446/kesdm-sebut-tak-ada-ketentuan-ekspor-impor-di-aturan-baru-plts-atap (accessed Oct. 8, 2026).
[25] P. Jowett, “Indonesia targets over 5.7 GW of rooftop solar by 2028,” pv magazine, Jun. 11, 2024. [Online]. Available: https://www.pv-magazine.com/2024/06/11/indonesia-targets-over-5-7-gw-of-rooftop-solar-by-2028/ (accessed Oct. 8, 2026).
[26] S. D. Susanti, “PLN pastikan tak membatasi pemasangan PLTS atap oleh pelanggan,” ANTARA News, Jun. 13, 2023. [Online]. Available: https://www.antaranews.com/berita/3586770/pln-pastikan-tak-membatasi-pemasangan-plts-atap-oleh-pelanggan (accessed Oct. 8, 2026).
[27] S. Ayudiana, “Pemanfaatan PLTS atap capai 538 MWp per Juli 2025,” ANTARA News, Sep. 2, 2025. [Online]. Available: https://www.antaranews.com/berita/5082017/pemanfaatan-plts-atap-capai-538-mwp-per-juli-2025 (accessed Oct. 8, 2026).
[28] S. Ayudiana, “RI harus tingkatkan kualitas SDM dukung target energi surya 17,1 GW,” ANTARA News, Jun. 19, 2025. [Online]. Available: https://www.antaranews.com/berita/4911649/ri-harus-tingkatkan-kualitas-sdm-dukung-target-energi-surya-171-gw (accessed Oct. 8, 2026).
[29] Ministry of Energy and Mineral Resources of the Republic of Indonesia, “Menuju NZE 2050–2060, Pemerintah dorong investasi kelistrikan 100 GW dan penguatan EBT,” press release, Sep. 22, 2026. [Online]. Available: https://www.esdm.go.id/id/media-center/arsip-berita/menuju-nze-2050-2060-pemerintah-dorong-investasi-kelistrikan-100-gw-dan-penguatan-ebt (accessed Oct. 8, 2026).
[30] B. Saputra, “SUSTAIN sebut atap surya dan power wheeling percepat target 100 GW,” ANTARA News, Apr. 13, 2026. [Online]. Available: https://www.antaranews.com/berita/5524095/sustain-sebut-atap-surya-dan-power-wheeling-percepat-target-100-gw (accessed Oct. 8, 2026).
[31] S. Ayudiana, “Menatap masa depan energi surya di Indonesia,” ANTARA News, Aug. 25, 2024. [Online]. Available: https://www.antaranews.com/berita/4285059/menatap-masa-depan-energi-surya-di-indonesia (accessed Oct. 8, 2026).
[32] H. T. Paradongan et al., “Techno-economic feasibility study of solar photovoltaic power plant using RETScreen to achieve Indonesia energy transition,” Heliyon, vol. 10, no. 7, Art. no. e27680, 2024, doi: 10.1016/j.heliyon.2024.e27680.
[33] Institute for Essential Services Reform, Indonesia Energy Transition Outlook (IETO) 2026. Jakarta, Indonesia: IESR, Nov. 2025. [Online]. Available: https://iesr.or.id/en/pustaka/indonesia-energy-transition-outlook-ieto-2026/ (accessed Oct. 8, 2026).
[34] A. Ananda, “IESR: Pemanfaatan PLTS industri perkuat ekosistem energi surya RI,” ANTARA News, Jul. 28, 2026. [Online]. Available: https://www.antaranews.com/berita/5669579/iesr-pemanfaatan-plts-industri-perkuat-ekosistem-energi-surya-ri (accessed Oct. 8, 2026).
[35] P. Jowett, “Indonesia’s installed solar capacity surpasses 700 MW,” pv magazine, Oct. 18, 2024. [Online]. Available: https://www.pv-magazine.com/2024/10/18/indonesias-installed-solar-capacity-surpasses-700-mw/ (accessed Oct. 8, 2026).
[36] R. A. Lingga, “Kuota PLTS atap 2024 hampir habis,” ANTARA Foto, Aug. 26, 2024. [Online]. Available: https://www.antaranews.com/foto/4287263/kuota-plts-atap-2024-hampir-habis (accessed Oct. 8, 2026).
[37] A. M. Fauzan, “AESI dorong akselerasi adopsi energi surya untuk industri,” ANTARA News, Jun. 13, 2026. [Online]. Available: https://www.antaranews.com/berita/5606511/aesi-dorong-akselerasi-adopsi-energi-surya-untuk-industri (accessed Oct. 8, 2026).
[38] F. Ashari, “SUN Energy: Target 100 GW EBT perlu ditopang regulasi yang adaptif,” ANTARA News, Sep. 8, 2026. [Online]. Available: https://www.antaranews.com/berita/5731731/sun-energy-target-100-gw-ebt-perlu-ditopang-regulasi-yang-adaptif (accessed Oct. 8, 2026).
[39] F. Ashari, “Kawasan industri harapkan kemudahan investasi energi terbarukan,” ANTARA News, Sep. 8, 2026. [Online]. Available: https://www.antaranews.com/berita/5732188/kawasan-industri-harapkan-kemudahan-investasi-energi-terbarukan (accessed Oct. 8, 2026).
[40] A. N. Zhafira, “Indonesia percepat transisi energi bersih lewat 1,3 GW PLTS Atap,” ANTARA News, Apr. 21, 2026. [Online]. Available: https://www.antaranews.com/berita/5535323/indonesia-percepat-transisi-energi-bersih-lewat-13-gw-plts-atap (accessed Oct. 8, 2026).
[41] N. A. Brohi, G. Thirunavukkarasu, M. Seyedmahmoudian, K. Ahmed, A. Stojcevski, and S. Mekhilef, “Advances in hosting capacity assessment and enhancement techniques for distributed energy resources: A review of dynamic operating envelopes in the Australian grid,” Energies, vol. 18, no. 11, Art. no. 2922, 2025, doi: 10.3390/en18112922.
[42] Institute for Essential Services Reform, Indonesia Energy Transition Outlook 2025: Navigating Indonesia’s Energy Transition at the Crossroads: A Pivotal Moment for Redefining the Future. Jakarta, Indonesia: IESR, Dec. 2024. [Online]. Available: https://iesr.or.id/wp-content/uploads/2024/12/Indonesia-Energy-Transition-Outlook-IETO-2025.pdf (accessed Oct. 8, 2026).
[43] T. S. Tran et al., “Study on the impact of rooftop solar power systems on the low voltage distribution power grid: A case study in Ha Tinh province, Vietnam,” Energy Rep., vol. 10, pp. 1151–1160, 2023, doi: 10.1016/j.egyr.2023.07.048.
[44] F. D. Wijaya, F. Waskito, E. Firmansyah, and J. C. Vasques, “Virtual inertia control topology addressing Indonesia’s low-inertia renewable grid resilience challenge,” J. Nas. Tek. Elektro Teknol. Inf., vol. 14, no. 4, pp. 307–316, 2025, doi: 10.22146/jnteti.v14i4.25234.
[45] E. Bellini, “Grid code standards key to unlock Indonesia’s solar potential,” pv magazine, Jan. 7, 2026. [Online]. Available: https://www.pv-magazine.com/2026/01/07/grid-code-standards-key-to-unlock-indonesias-solar-potential/ (accessed Oct. 8, 2026).
[46] Institute for Essential Services Reform, “The importance of increasing flexibility in electricity decarbonization,” policy brief, Jakarta, Indonesia, Feb. 2026. [Online]. Available: https://iesr.or.id/en/pustaka/the-importance-of-increasing-flexibility-in-electricity-decarbonization/ (accessed Oct. 8, 2026).
[47] J. V. Tampubolon, R. Dalimi, and B. Sudiarto, “Rooftop photovoltaics as negative load to mitigate electric vehicle charging peaks in Jamali grid by 2060 to achieve net zero emission in Indonesia,” World Electr. Veh. J., vol. 17, no. 2, Art. no. 85, 2026, doi: 10.3390/wevj17020085.
[48] N. P. P. Muliantari, “IESR usulkan PLTS atap jadi solusi Bali capai target emisi,” ANTARA News, Oct. 7, 2026. [Online]. Available: https://www.antaranews.com/berita/5775141/iesr-usulkan-plts-atap-jadi-solusi-bali-capai-target-emisi (accessed Oct. 8, 2026).
[49] A. D. Sakti et al., “Multi-criteria assessment for city-wide rooftop solar PV deployment: A case study of Bandung, Indonesia,” Remote Sens., vol. 14, no. 12, Art. no. 2796, 2022, doi: 10.3390/rs14122796.
[50] K. T. N. Ihsan, A. D. Sakti, and K. Wikantika, “Geospatial assessment for planning a smart energy city using rooftop solar photovoltaic in Bandung City, Indonesia,” Int. Arch. Photogramm. Remote Sens. Spatial Inf. Sci., vol. XLIV-M-3-2021, pp. 83–87, 2021, doi: 10.5194/isprs-archives-XLIV-M-3-2021-83-2021.
[51] E. Tarigan, “Simulasi optimasi kapasitas PLTS atap untuk rumah tangga di Surabaya,” Multitek Indones., vol. 14, no. 1, pp. 13–22, 2020, doi: 10.24269/mtkind.v14i1.2600.
[52] E. Tarigan, “Simulasi sistem PLTS atap dan harga satuan energi listrik untuk skala rumah tangga di Surabaya,” J. Rekayasa Elektr., vol. 18, no. 2, 2022, doi: 10.17529/jre.v18i2.25535.
[53] R. W. Santoso et al., “Performance and techno-economic analysis of a 1.82 kWp rooftop PV system in the tropical climate of Indonesia: A simulation vs reality approach,” J. Nas. Tek. Elektro, vol. 15, no. 1, 2026, doi: 10.25077/jnte.v15n1.1427.2026.
[54] V. Nurliyanti et al., “Exploring alternative policies to reduce electricity subsidies in Indonesia,” E3S Web Conf., vol. 294, Art. no. 02005, 2021, doi: 10.1051/e3sconf/202129402005.
[55] Suparwoko and F. A. Qamar, “Techno-economic analysis of rooftop solar power plant implementation and policy on mosques: An Indonesian case study,” Sci. Rep., vol. 12, no. 1, 2022, doi: 10.1038/s41598-022-08968-6.
[56] M. Z. Abdurrohman and H. Batih, “Analisis kelayakan PLTS atap menggunakan metode real option dengan pemanfaatan insentif pendanaan: Studi kasus SMA Future Gate,” Din. Rekayasa, vol. 19, no. 1, pp. 19–28, 2023, doi: 10.20884/1.dr.2023.19.1.1343.
[57] M. Effendy et al., “Studi kelayakan teknis dan ekonomi pembangkit listrik tenaga surya rooftop di Hotel Rayz Universitas Muhammadiyah Malang,” Techné, vol. 23, no. 1, 2024, doi: 10.31358/techne.v23i1.455.
[58] K. A. Wibowo, D. Pravitasari, A. A. Kurniawan, and I. Nawawi, “Perancangan pembangkit listrik tenaga surya (PLTS) atap on-grid 44 kWp untuk melayani beban penerangan di industri,” Aviat. Electron. Inf. Technol. Telecommun. Electr. Controls (AVITEC), vol. 6, no. 2, pp. 169–180, 2024, doi: 10.28989/avitec.v6i2.2194.
[59] D. M. P. Utami et al., “Toward zero downtime sustainable data centers in tropical regions: A rooftop photovoltaic–battery hybrid approach with techno-economic and policy insights,” Eng. Sci., vol. 39, Art. no. 2011, 2026, doi: 10.30919/es2011.
[60] M. F. Umam, M. F. A. Patria, S. Fitri, M. Cantika, W. R. Pramudya, and H. A. Farras, “The effect of roof slope and orientation on the performance of on-grid PV plants in Central Java, Indonesia,” J. Renew. Energy Mech., vol. 9, no. 1, pp. 1–14, 2026.
[61] P. M. Khuong, R. McKenna, and W. Fichtner, “A cost-effective and transferable methodology for rooftop PV potential assessment in developing countries,” Energies, vol. 13, no. 10, Art. no. 2501, 2020, doi: 10.3390/en13102501.
[62] R. Ilham and H. Batih, “Analisis dampak kebijakan implementasi PLTS atap pada gedung pemerintah menggunakan skenario proyeksi,” J. Elkomika, vol. 11, no. 4, 2023, doi: 10.26760/elkomika.v11i4.834.
[63] M. D. Afriani and S. Poletti, “Evaluating renewable energy pathways and emissions targets in Indonesia: An OSeMOSYS-based economic and sensitivity analysis of PLN,” Energy Policy, vol. 211, Art. no. 115093, 2026, doi: 10.1016/j.enpol.2026.115093.
[64] A. Halimatussadiah et al., “The impact of fiscal incentives on the feasibility of solar photovoltaic and wind electricity generation projects: The case of Indonesia,” J. Sustain. Dev. Energy Water Environ. Syst., vol. 11, no. 1, pp. 1–16, 2023, doi: 10.13044/j.sdewes.d10.0425.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International Licence (CC BY-SA 4.0).